Page 246 - IRSEM_Main Book
P. 246

10.2.12 Items of Works not Included in Contract Documents

                        (a) Officer/incharge & supervisor/incharge of the work shall ensure that no item
                            of  work  that  is  not  included  in  the  contract  is  carried  out  without  the
                            sanction of the competent authority.


                        (b) Items  of  work  not  included  in  a  contract  may,  if  deemed  expedient,  be
                            executed  under  the  contract  at  the  rates  mutually  agreed  on  by  the
                            contracting parties.

               10.2.13 Modifications  to  Contract:  In  the  event  of  any  of  the  provisions  of  the
                        contract  requiring  to  be  modified  after  the  contract  documents  have  been
                        signed, the modifications shall be made in writing and signed by the Railway
                        and the contractor and no work shall proceed under such modifications until
                        this has been done. Any verbal or written arrangement abandoning modifying,
                        extending, reducing or supplementing the contract or any of the terms thereof
                        shall be deemed conditional and shall not be binding on the Railway unless
                        and until the same is incorporated in a formal instrument signed by the Railway
                        and the contractor, and till then the Railway shall have the right to repudiate
                        such arrangement.

               10.2.14 Issue of Departmental  Materials to Contractors: When so specified in the
                        contract,  cables  and  other  S&T  materials  shall  be  issued  to  contractor  and
                        receipts obtained for the same, It shall be ensured that the Contractors takes
                        reasonable care of all materials made over to him and that on completion of
                        the works the unused balance of the same are handed over by him in good
                        order.

                                Section 3: Measurements and Measurement Books

               10.3.1  Code  References:  The  rules  regarding  the  recording  of  measurements  in
                        measurement  books,  care  and  custody  of  measurement  books  and  the
                        preparation  of  contract  bills  are  given  at  Para  1313  E.  (Annexure  10-A1)  of
                        Engineering code.

               10.3.2  Measurement Books

                        (a) Each measurement book shall have;

                            (i)  Instructions printed at the commencement.

                            (ii) An  Index  which  should  be  posted  up-to-date.  A  form  of  measurement
                               book is attached as Annexure: 10-A1.

                        (b) Measurement books shall be issued to the SSE/JE(Signal)/incharge of the
                            work,  by  the  Sr  Divisional  Signal  and  Telecommunication  Engineer/Dy
                            Chief Signal and Telecommunication Engineer as required, duly numbered
                            thus  M.  B.  No  ................  of  yyyy.  As  few  books  shall  be  issued  as  can
                            conveniently meet the requirements.

                        (c) A register of measurement books shall be maintained by the Sr Divisional
                            Signal   and     Telecommunication       Engineer/Dy     Chief    Signal    and
                            Telecommunication Engineer where in the contents and the movement of
                            each measurement book shall be indicated.