Para No. 9.2.3(c)                                                           Annexure: 9-A10

                        Check List for PCSTE Application for Sanction for Signalling Works

                                                    _____________ RAILWAY


                 (1) List of documents/drawings enclosed:

                                                                                           YES/NO/NA

                      (a) Description of proposed works.

                      (b) Signalling and Interlocking plan no.

                      (c)  Mid section LC Gate drawings (if any)
                      (d) Panel Front Plate/VDU diagrams Diagram No. (If it is Panel or EI
                         installations)
                      (e) Route Control Chart/Control Table/Locking Table no.

                      (f)  Station Working Rule (SWR) with SWR diagram No.

                      (g) List of infringement to Schedule of Dimensions.
                      (h) List of deviations from the manuals of instruction for signaling
                         and interlocking and Block signaling.

                      (i)  List of deviations from General and Subsidiary Rules.

                      (j)  Restrictions (if any)
                      (k)  The work will be executed by unit ……………………..


                 (2) Other drawings enclosed:

                      (a)

                      (b)

                      (c)
                      (d)


                 Signature of officer concerned ________________
                 Name         :

                 Designation  :
                 Unit         :

                 Mobile No  :

                 Note: Actual check list (if any) may be obtained from office of PCSTE concerned & submit
                 accordingly.