Page 228 - IRSEM_Main Book
P. 228

Para No. 9.2.5(a)                                                                          Annexure: 9-A2

               ………………………… RAILWAY
                                                    Safety Certificate

                 When the Commissioner of Railway Safety does not inspect the work prior to opening, this
                 certificate must be signed before opening temporary or new works.

                 From,

                      The  Divisional  Railway  Manager/Deputy  Chief  Engineer  (Construction)/Deputy  Chief
                 Signal and Telecommunication Engineer (Construction)…………………..Division.

                 To,

                      The Commissioner of Railway Safety,
                      ……………………………………………..

                 Description of work ……………………………………………………………………………………
                 ……………………………………………………………….…………………………………………

                 With Reference to Application…….…..……………dtd……………sanctioned under Commissioner of
                 Railway Safety No……………………..dtd…………………….to commence and open the above work.

                 Following permanent/temporary work has been done
                 ………………………………………………………………………………………………………………………………………………
                 ………………………………………………………………………..

                 I/We do hereby certify that, in the work above mentioned:


                 (i)  The  schedule  of  dimensions  has  not  been  infringed  *except  in  regard  to  the  items
                     sanctioned under letter * No……………………………..dated……………….…………..

                 (ii)  Engineering work has been carried out in accordance with Plan No………………*except in
                     regard to the alterations sanctioned under letter No………………….dated………………….

                 (iii)  The weight of rails, strength of bridges and general structural character of the works are
                     such as have been prescribed under the rules.

                 (iv)  The  *Signalling  and  *Interlocking  and  *Block  Signalling  has  been  carried  out  in
                     accordance with Signalling Plan No…………………….. and the requirements and instructions
                     laid down in the Signal Engineering Manual have been completed * except in regard to
                     the items sanctioned under letter No……………………………..dated……….………..

                 The work has been carried out in accordance with the documents already supplied.


                2. A  certificate  from  the  Divisional  Safety  Officers/………………..  stating  that  the  necessary
                   working rules have been issued and giving reference in regard to sanction to deviation (if
                   any) from General and Subsidiary rules is attached/not required.

                 * To be scored out if not applicable.



                                    Chapter 9: Procedure for Commissioning of Signalling Installations   Page 195 of 535
   223   224   225   226   227   228   229   230   231   232   233