Page 228 - IRSEM_Main Book
P. 228
Para No. 9.2.5(a) Annexure: 9-A2
………………………… RAILWAY
Safety Certificate
When the Commissioner of Railway Safety does not inspect the work prior to opening, this
certificate must be signed before opening temporary or new works.
From,
The Divisional Railway Manager/Deputy Chief Engineer (Construction)/Deputy Chief
Signal and Telecommunication Engineer (Construction)…………………..Division.
To,
The Commissioner of Railway Safety,
……………………………………………..
Description of work ……………………………………………………………………………………
……………………………………………………………….…………………………………………
With Reference to Application…….…..……………dtd……………sanctioned under Commissioner of
Railway Safety No……………………..dtd…………………….to commence and open the above work.
Following permanent/temporary work has been done
………………………………………………………………………………………………………………………………………………
………………………………………………………………………..
I/We do hereby certify that, in the work above mentioned:
(i) The schedule of dimensions has not been infringed *except in regard to the items
sanctioned under letter * No……………………………..dated……………….…………..
(ii) Engineering work has been carried out in accordance with Plan No………………*except in
regard to the alterations sanctioned under letter No………………….dated………………….
(iii) The weight of rails, strength of bridges and general structural character of the works are
such as have been prescribed under the rules.
(iv) The *Signalling and *Interlocking and *Block Signalling has been carried out in
accordance with Signalling Plan No…………………….. and the requirements and instructions
laid down in the Signal Engineering Manual have been completed * except in regard to
the items sanctioned under letter No……………………………..dated……….………..
The work has been carried out in accordance with the documents already supplied.
2. A certificate from the Divisional Safety Officers/……………….. stating that the necessary
working rules have been issued and giving reference in regard to sanction to deviation (if
any) from General and Subsidiary rules is attached/not required.
* To be scored out if not applicable.
Chapter 9: Procedure for Commissioning of Signalling Installations Page 195 of 535