Page 208 - IRSEM_Main Book
P. 208

8.7.10 Locking of Advanced Starter and Starter Signal at Junction Stations: Refer to
                        Para 21.1.10

                8.7.11 Level Crossing Gates circuits: Refer to Para 21.1.11

                8.7.12 Point Control Circuits: Refer to Para 21.1.12

                8.7.13 Crank Handle & Siding Control Keys: Refer to Para 21.1.13

                8.7.14 Cross Protection features: Refer to Para 21.1.14


                8.7.15 Control Terminal (Video Display Unit (VDU)): Refer to Para 21.1.15

                8.7.16 Precautions for design of circuits using Electronic devices: Refer to Para 21.1.16

                8.7.17 Train Detection (Track Circuits & Axle Counters): Refer to Para 21.1.17

                8.7.18 Interface with Electronic Interlocking: Refer to Para 21.4.3


                8.7.19 Version control of Softwares of Electronic Interlocking: Refer to Para 21.4.7

                8.7.20 Lightning  &  Surge  protection  for  Signalling  systems:  Refer  to  Chapter  21,
                        section 7



                                                  Note: This Chapter has under mentioned Annexures

                        S.No.  Annexure No.                          Description
                                              Various Books of Reference and their Distribution among
                          1        8-A1
                                              the Staff

                          2        8-A2       Check List for Engineering Scale Plan (ESP)


                               Note: This Chapter has under mentioned Drawings in Appendix II
                        S.No.     Drg No.                            Description

                          1        8-D1       Signalling Interlocking Plan for Double Line Station

                          2        8-D2       Control Table for Double Line Station
                          3        8-D3       VDU Layout Plan for Electronic Interlocking (EI)




















                                                Chapter 8: Drawings & Specifications              Page 175 of 535
   203   204   205   206   207   208   209   210   211   212   213