Page 18 - IRSEM_Main Book
P. 18

Index of Indian Railways Signal Engineering Manual (IRSEM)

                 Sl.                                                                                   Page
                No.                                      Contents                                       No.


                195. Chapter 18: Block Instruments, BPAC & IBS Working                                  356

                196.      Section 1: Block Instruments General Requirements                             356

                197.      Section 2: Special Requirements of Block Working in RE Area                   360

                198.      Section 3: Installation of Block Instruments                                  362

                199.      Section 4: Installation of Single Line Token Instruments                      364

                200.      Section 5: Installation of Single Line Tokenless Block Instrument             365

                201.      Section 6: Installation of Double Line Block Instruments                      366

                202.      Section 7: Maintenance of Token Instruments – General                         366

                203.      Section 8: Maintenance of Block Instruments & their Ancillary Apparatus  368
                                     − General Instructions

                204.      Section 9: Maintenance of Single Line Block – Instructions                    370

                205.      Section 10: Maintenance of Block Proving by Axle Counter                      371

                206.      Section 11: Maintenance of Embedded type Block working                        371

                207.      Section 12: Intermediate Block Signalling (IBS)                               371

                208.      Annexure 18-A1: Painting Scheme − Block Signalling Equipment                  375

                209.      Annexure 18-A2: Tokens Lost/Tablets Lost                                      376

                210.      Annexure 18-A3: Token Balance Book                                            377

                211.      Annexure 18-A4: Intermediate Block Signalling (using OFC, MSDAC)              378

                212.  Chapter 19: Outdoor Signalling - Installation, Testing and                        387
                                       Maintenance of Equipment


                213.      Section 1: General Instructions on Tools                                      387

                214.      Section 2: Installation of Signals                                            388

                215.      Section 3: Installation of IRS Point Machines                                 390

                216.      Section 4: Thick Web Switches (TWS)                                           394

                217.      Section 5: Installation of Electrical Point Detector (EPD)                    396

                218.      Section 6: Signalling Relays                                                  396

                219.      Section 7: Fuses                                                              397

                220.      Section 8: Testing of Signalling Circuits                                     397
                                                             (ix)
   13   14   15   16   17   18   19   20   21   22   23