Page 16 - IRSEM_Main Book
P. 16

Index of Indian Railways Signal Engineering Manual (IRSEM)

                 Sl.                                                                                   Page
                No.                                      Contents                                       No.


                145.      Section 20: Maintenance of Double Wire Installations                          254

                146.      Section 21: Maintenance of Signals and Fittings                               256

                147.      Section 22: Maintenance of Point, Trap and Shunting Permitted                 258
                                       Indicators

                148.      Section 23: Maintenance Schedule                                              258

                149.      Section 24: Overhauling and Testing of Interlocking Mechanical/               259
                                       Electromechanical

                150.      Section 25: Overhauling of Interlocking Frames, Interlocking Key              259
                                       Boxes and Station Master’s Slide Control Frames

                151.      Section 26: Testing of  Interlocking Frames, Interlocking Key  Boxes          263
                                       and Station Master’s Slide Control Frames

                152.      Section 27: Records of Testing and Overhauling                                268

                153.      Section 28: Testing and Overhauling of Electromechanical Installations        269

                154.      Annexure 12-A1: Essential Requirements before Interlocking of a Point         272

                155.      Annexure 12-A2: Certificate of Overhauling of Interlocking Frames             273

                156.      Annexure 12-A3: Certificate of Testing of Locking                             274

                157. Chapter 13: ATP, ETCS, TPWS, IRATP (TCAS) & TMS                                    275


                158.      Section 1: General Requirements                                               275

                159.      Section 2: European Train Control Systems (ETCS) & Train Protection           277
                                      and Warning Systems (TPWS)

                160.      Section 3: IRATP – Train Collision Avoidance System (TCAS)                    284

                161.      Section 4: Traffic Management System (TMS)                                    288

                162.      Annexure 13-A1: Breaking Distance Calculations for TCAS                       296


                163. Chapter 14: LC Gates                                                               300

                164.      Section 1: LC General                                                         300

                165.      Section 2: Installation of LC Gates                                           305

                166.      Section 3: Maintenance of LC Gates                                            308

                167.      Annexure 14-A1: Safety Measures to be Provided at Level Crossings             311


                                                            (vii)
   11   12   13   14   15   16   17   18   19   20   21