Page 16 - IRSEM_Main Book
P. 16
Index of Indian Railways Signal Engineering Manual (IRSEM)
Sl. Page
No. Contents No.
145. Section 20: Maintenance of Double Wire Installations 254
146. Section 21: Maintenance of Signals and Fittings 256
147. Section 22: Maintenance of Point, Trap and Shunting Permitted 258
Indicators
148. Section 23: Maintenance Schedule 258
149. Section 24: Overhauling and Testing of Interlocking Mechanical/ 259
Electromechanical
150. Section 25: Overhauling of Interlocking Frames, Interlocking Key 259
Boxes and Station Master’s Slide Control Frames
151. Section 26: Testing of Interlocking Frames, Interlocking Key Boxes 263
and Station Master’s Slide Control Frames
152. Section 27: Records of Testing and Overhauling 268
153. Section 28: Testing and Overhauling of Electromechanical Installations 269
154. Annexure 12-A1: Essential Requirements before Interlocking of a Point 272
155. Annexure 12-A2: Certificate of Overhauling of Interlocking Frames 273
156. Annexure 12-A3: Certificate of Testing of Locking 274
157. Chapter 13: ATP, ETCS, TPWS, IRATP (TCAS) & TMS 275
158. Section 1: General Requirements 275
159. Section 2: European Train Control Systems (ETCS) & Train Protection 277
and Warning Systems (TPWS)
160. Section 3: IRATP – Train Collision Avoidance System (TCAS) 284
161. Section 4: Traffic Management System (TMS) 288
162. Annexure 13-A1: Breaking Distance Calculations for TCAS 296
163. Chapter 14: LC Gates 300
164. Section 1: LC General 300
165. Section 2: Installation of LC Gates 305
166. Section 3: Maintenance of LC Gates 308
167. Annexure 14-A1: Safety Measures to be Provided at Level Crossings 311
(vii)