Page 17 - IRSEM_Main Book
P. 17
Index of Indian Railways Signal Engineering Manual (IRSEM)
Sl. Page
No. Contents No.
168. Chapter 15: Cables 314
169. Section 1: General 314
170. Section 2: Paying Out, Trenching & Laying of Cables 315
171. Section 3: Cable Laying in RE Area 319
172. Section 4: Insulation Resistance Testing of Signal Cables 320
173. Section 5: Maintenance of Cables 321
174. Chapter 16: Power Supply Systems for Signalling 323
Installations
175. Section 1: Power Supply General 323
176. Section 2: Sources of Power Supply 323
177. Section 3: Distribution of Power Supply 325
178. Section 4: Power Supply Equipment 325
179. Section 5: Installation of Secondary Cells 326
180. Section 6: Installation of Power Supply Equipment 327
181. Section 7: Installation of DG Set 327
182. Section 8: Maintenance of Secondary Cells 328
183. Section 9: Maintenance of Power Supply Equipment 329
184. Section 10: Maintenance of DG Set 329
185. Chapter 17: Train Detection - Track Circuits & Axle Counters 331
186. Section 1: Track Circuits 331
187. Section 2: Installation of DC Track Circuits 332
188. Section 3: Maintenance of DC Track Circuits 336
189. Section 4: Audio Frequency Track Circuits (AFTC) 340
190. Section 5: Precautions for DC Track Circuits & AFTC in RE Area 342
191. Section 6: Axle Counters − General 348
192. Section 7: Installation of Axle Counters 348
193. Section 8: Maintenance of Axle Counters 352
194. Annexure 17-A1: Measurement of Stray Direct Current before Installation 354
of DC Single Rail Track Circuits
(viii)