Page 595 - IRSEM_Main Book
P. 595

S No   Term   Description/Meaning in SEM       Relevant paras
 Preventive
 111   Maintenance to carry out to mitigate degradation and reduce the probability of failure.
 Maintenance
 Documented set of time scheduled activities, resources and events serving to implement the
 112  RAM Plan   organizational  structure,  responsibilities,  procedures,  activities,  capabilities  and  resources
 that together ensure that an item will satisfy RAM requirements relevant.
 113  Rear Section   The Section between LSS and IB Signal (including 400 meters of overlap).   18.12.1(a)(b)(d) (e)
 114  Reference   A location on the track (e.g. balise group reference location or RFID tag location) used as a
 Location   reference for the information sent from trackside or for the train position.
                                                3.5.7(a), 7.8.1(a),
 An electromagnetic device, which is used to convey information from one circuit to another  11.1.2, 17.1.1(e),
 115  Relay
 circuit through a set of contact i.e. front or back contact.   18.2.4, 18.8.1(f),
                                                19.8.8(a), 20.2.2(a,b)
 116  Release Speed  A speed value to allow a train to approach the end of its movement authority.   13.2.3(g)(j)k)
                                                7.8.8,  8.7.1(c)(d),
 Ability  to  perform  as  required,  without  failure  for  a  given  time  interval,  under  given
 117  Reliability                               21.1.1(e), 21.3.4(a)
 conditions.
                                                Annexure: G1
 Required   Minimum distance  between two  points  duly  taking  gradients  into  consideration  to  ensure
 118
 Distance   functionality & safety.
 Hard Reset is a type of reset which when applied will directly reset the failed Axle counter
 119  Reset-Hard   system.
 It is not to be applied in a working Station/Section.
 A type of reset (applied on a failed axle counter system) by due Co-operation between two  17.7.5 (a)
 Operating Staff/Station Masters or One Station Master & Another Operating staff at site after
 Reset –
 120   ensuring laid down conditions - such as arrival of last vehicle or clearance of the track section
 Cooperative
 (using line verification box after physical verification of Failed Track section). The axle counter
 will show ‘clear’ after application of this type of reset.
 Reset -                                        17.7.5 (a)
 121   -do-
 Conditional



 Annexure: G4: Glossary of Technical Terms for Signal Engineering Manual   Page 525 of 535
   590   591   592   593   594   595   596   597   598   599   600