Page 49 - IRSEM_Main Book
P. 49
(ix) Loading/unloading/Handling of T&P items and all materials as per
instructions of Supervisor.
(x) Manning and protection of installations/S&T gears on need basis as
guided by Supervisor.
(xi) Reporting of rubbing of stretcher bar with Stock Rail bottom (if any).
(xii) Assisting Supervisor/Technician during testing/Maintenance/Inspections,
Carrying Tools & Plants for Maintenance/Failures.
(xiii) Handling/topping-up of Distilled water, Electrolyte, HSD oil and applying
Petroleum Jelly, Lubricants etc. as per instructions of Technician/SSE/JE.
(xiv) Assisting Supervisor in documentation works.
(xv) Accompanying/Assisting Technician/SSE/JE and Higher officials in
their day to day works.
(b) Technical duties of Helper are as under
(i) Removal of obstruction to points.
(ii) Removal of excess bars formation at insulation joints.
(iii) Be aware of working in RE area.
(iv) Check RE bonds, their intactness.
(v) Check water logging in track circuited areas.
(vi) Any other duty assigned by SSE/JE(Signal) or Technician
Note: This Chapter has under mentioned Annexures
S.No Annexure No Description
1 3-A1 Signal Visibility Certificate for Existing Signals
2 3-A2 Foot Plate Inspection of Signals
3 3-A3 Inspection and Testing Certificate
4 3-A4 Action in case of Accidents
5 3-A5 List of Drawings & Registers at a Station
6 3-A6 Cause Wise Analysis of Signal Incidences
7 3-A7 SSE/JE’s (Signal) Progress Report
8 3-A8 SSE/JE’s(Signal) Completion Certificate
9 3-A9 Technician’s (Signal) Report
10 3-A10 Disconnection/Reconnection Notice
11 3-A11 Where Disconnection notice is not required
12 3-A12 Competency Certificate cum Training History book
13 3-A13 Hours of Employment Regulations, Workmen’s Compensation
Act, Payment of Wages Act. (Extracts of Manuals)
Chapter 3: Duties Of Signal Supervisors And Technical Staff Page 28 of 535