14.3.2  Maintenance of  Electric Lifting Barrier (ELB)

                        (a) Machines must be kept in good condition, free from rust, dust and dirt.

                        (b) The bearing surface and moving parts of the electric lifting barrier shall be
                           lubricated properly.

                        (c) Contacts must be kept clean and in proper adjustment. If contact surfaces
                           are pitted, they must be replaced.

                        (d) Commutator and Brushes

                            (i)  Commutator must be clean, smooth and have a bright appearance.


                            (ii)  Brushes must be kept clean and properly bedded on the commutator.
                               Brushes  should  have  proper  pressure  and  should  be  free  in  brush
                               holders.

                        (e) Friction clutch must be so adjusted that the same should get de-clutched
                           when the boom is raised or lowered fully and the power supply is not cut
                           off.

                        (f)  The  shock  absorber  at  the  boom  rest  (stop  post)  must  be  kept  properly
                           adjusted.

                        (g) The  time  of  operation  of electric  lifting  barrier  shall not  exceed  stipulated
                           time. Measured value of current should not exceed rated values.

                        (h) The satisfactory functioning of the  lifting barrier by a hand  crank shall be
                           checked.

                        (i)  All gate locking apparatus must be examined regularly and working parts
                           kept oiled. Gate locks must be kept in good working order.

                        (j)  Proper working of audio/visual warning shall be ensured.

                        (k) Approach  warning  arrangement  where  provided,  is  working  satisfactorily
                           and effectiveness of Approach and Back locking provided shall be ensured.

                        (l)  Track circuits/Axle counters, if provided, shall be maintained in accordance
                           with instructions laid down in Chapter 17 of SEM.

                        (m)  Communication of approved type, provided between Level Crossing gates
                            and the adjoining stations shall be checked in regard to their satisfactory
                            functioning.


                        (n) Heavy  repairs,  renewals  or  alterations  to  gate  interlocking  must  not  be
                            carried out until Jr. Engineer/Sr. Section Engineer (Signal) concerned has
                            arranged for the protection of the road traffic by the concerned department
                            and the work shall be carried out under proper disconnection.