Page 374 - IRSEM_Main Book
P. 374
Note: This Chapter has under mentioned Annexures in Appendix I
S.No Annexure Description
No
1 15-MS1 Maintenance Schedule of Cable, Cable Insulation Resistance Test Sheet,
Instructions for Insulation Resistance Testing of Signalling Cable.
2 15-MS2 Maintenance Schedule of Earth Leakage Detector (ELD).
Note: This Chapter has under mentioned Drawings in Appendix II
Drawing
S. No Description
No
1 15-D1 Drawing for RCC cable marker.
2 15-D2 Drawing for cable laying when rock faced at 300 mm, 400 mm, 600 mm
3 15-D3 Drawing for RCC duct 500 mm & Drawing of RCC split pipe 100 mm dia
4 15-D4 Drawing of DWC split pipe (120 mm dia).
5 15-D5 Drawing for Road/Track crossing.
6 15-D6 Drawing for Cable trough for metallic bridge.
7 15-D7 Drawing for Cable laying on culverts.
8 15-D8 Drawing for Cable laying on culverts with high flood level.
9 15-D9 Cable core plans for a;
4-Road station with PI,
6-Road station with Distributed EI,
6-Road station with PI with either side cable Huts.
10 15-D10 Cable Plan for Electric Lifting Barrier (ELB) at Station.
Chapter 15: Cables Page 322 of 535