Page 35 - IRSEM_Main Book
P. 35

(e) The inspection shall be thorough with reference to the prescribed Schedule
                            of   Maintenance      and    purposeful     to   ensure     that   equipments
                            function satisfactorily, safely and with minimum liability to failures.

                        (f)  The  Interlocking  Plan,  Cabin  Diagrams,  Working  Rules  etc.  shall  be
                            inspected to see that they are up-to-date. Any discrepancy noticed shall be
                            brought to the notice of the SSE(Signal)/Incharge.

                        (g) A record shall be made in the Signal Failure and Inspection Book at each
                            station during monthly inspection.


                        (h) All  interlocked  points  and  crossings  must  be  jointly  inspected  by
                            SSE(Signal)/Sectional  Incharge  with  SSE(P.way)/Incharge  and  Sectional
                            SSE/JE (Signal) with SSE/JE(P.way) alternately and duration between two
                            joint inspections shall not exceed 3 months.

                        (i)  Signal Staff should attend the failure only after giving disconnection memo
                            (where required) for gear at fault and duly taking acknowledgement from
                            operating statf at the station.

                        Note:  Stipulations  of  Para  3.1.2  is  also  applicable  to  all  Sectional  SSE/JE  (Signal)
                        &Technician (Signal).

                3.1.3  Foot-Plate Inspections

                        (a) The SSE(Signal)/Incharge, Sectional SSE/JE(Signal) shall carry out foot-
                            plate  inspection  of  all  signals  by  day  and  night  in  both  Up  and  Down
                            directions over his entire jurisdiction as given below:
                            (i)  Once in three months for SSE (Signal)/Incharge

                            (ii)  Once a month for Sectional SSE/JE (Signal)

                         (b) During the inspection he shall take special notice of the following
                            All  signals  shall  have  adequate  visibility  as  specified  in  para  No.  7.1.11
                            preferably  from  the  Loco  pilot  side  of  the  foot-plate.  No  fixed  light  is
                            interfering  with  the  sighting  of  the  Signals.  If  the  visibility  of  a  signal  is
                            affected by growing tree branches or other structure or other obstructions,
                            the  matter  shall  be  noted  for  corrective  action.  Cases  requiring  special
                            attention, such as trees in private lands shall be referred to Sr. Divisional
                            Engineering through Sr. DSTE with full particulars of the topography of the
                            area for his information, necessary action. In other cases the supervisors
                            shall arrange to remove the obstructions as early as possible by P.Way
                            Staff as per IR P.Way Manual.

                        (c) Anything which may endanger safety or interfere with signalling gears, the
                            same  shall  be  brought  to  the  notice  of  the  concerned  department.  If
                            immediate  action  is  necessary  for  reasons  of  safety,  information  to  be
                            conveyed to the Station Master and control room.

                        (d) Any  abnormality  in  working  of  signals  shall  be  brought  to  the  notice  of
                            Station Master concerned.




                                       Chapter 3: Duties Of Signal Supervisors And Technical Staff   Page 14 of 535
   30   31   32   33   34   35   36   37   38   39   40