Page 319 - IRSEM_Main Book
P. 319
Para No. 12.25.9(a), 12.28.6(a) Annexure: 12-A2
Certificate of Overhauling of Interlocking Frames
....................RAILWAY
SIGNAL AND TELECOMMUNICATION DEPARTMENT
No........................
To
The Divisional Signal and Telecommunication Engineer,
......................................Division
This is to certify that I have personally supervised the overhauling of the interlocking frames/
Interlocking key boxes/Station Master's slide control frames at the station/cabins on my
section shown below, and that they have been thoroughly examined and cleaned, also
repaired or refitted where necessary and all parts are in good working order. The mechanical
locking is in accordance with the approved interlocking charts and interlocking tables.
Station Apparatus Date of Date
/Cabin overhauled last overhauled Reference to plans Remarks
name overhaul
Locking
table, Signalling
locking plan
diagram
Dated:
Signature............................
Name ………………………………
Designation.........................
Station.................................
Page 273 of 535