(k)  Control  over  expenditure  in  relation  to  budget  allotments  and  sanctioned
                           estimates.

                       (l)  Submission of proposals for Revenue and Works Budget and for periodic
                           reviews.
                       (m) Exercise of such powers as may be delegated to him/her in Establishment
                           and other matters.

                       (n)  Ensuring strict discipline amongst his/her staff within the frame work of the
                           Rules.
                       (o)  Dealing promptly with appeals and representations from and looking after
                           the welfare of staff.

                       (p)  Issue of special and specific maintenance schedules for SSE(Signal)/Incharge,
                           Sectional SSE/JE (Signal) and Technicians as and when necessary.
                2.1.2  Transfer of Charge

                       (a) Instructions  on  "Transfer  of  Charge"  are  contained  in  Chapter  I  of  Indian
                           Railway Code for Engineering Department.

                       (b) Senior Divisional Signal and Telecommunication Engineer/Dy. Chief Signal
                           and Telecommunication Engineers handing over and taking over charge of
                           a  Division  or  of  a  work  shall  carry  out  joint  inspection  of  such  works  or
                           important sections as necessary.

                       (c) The "Transfer of Charge" statement shall be prepared in adequate number of
                           copies, signed by both and one copy sent to the Principal Chief Signal and
                           Telecommunication Engineer.
                2.1.3  Applicability to other Signal and Telecommunication Engineers:

                       These instructions with suitable modifications will apply to the other Signal and
                       Telecommunication  Engineers  such  as  DSTE/ASTE  posted  to  a  Division  or
                       extra Divisional units for executions of works.


                       Section 2:  Additional Duties of Signal and Telecommunication
                                       Engineer Incharge of Maintenance
                2.2.1  Sr DSTE is generally responsible for:

                       (a)  Ensuring that no alteration to an installation is made, which is a deviation
                           from  the  original  approved  plan  diagram  or  specification,  without  the
                           authority of the Principal Chief Signal and Telecommunication Engineer.

                       (b)  Sr.DSTE shall inspect 20% of Installations or any other percentage/number of
                           installations in his Jurisdiction as decided by PCSTE of Zonal Railway once in a
                           year  and  every  section  must  be  covered.  He  shall  also  ensure  stipulated
                           Inspections by a monthly report of inspections so made shall be submitted to
                           the Headquarters Office.

                       (c)  Ensuring  of  Inspection  of  Signals  within  his  jurisdiction  from  footplate  of  a
                           locomotive or  a driving cab both by day and  by night  in both  Up  and Down
                           direction once in a year, at ASTE/DSTE level preferably jointly with officers of
                           Mechanical/Electrical/Operating/ Engineering Departments.


                                      Chapter 2:  Duties Of Signal And Telecommunication Engineers   Page 8 of 535