Page 67 - IRSEM_Main Book
P. 67
Cause Wise Analysis of Signal Incidences
Cum. up Cum. up to
Position of Position of Same to the the same
S.No Causes current last month month last current period last
month year
month year
1n.3 On board
Total (A)
Non- Chargeable ( B)
2 OPERATING
TFOK (Tested and found
2.1
ON).
NINA (None informed
2.2
none attended)
2.3 Wrong operation
2.4 Obstruction in point
Others(Sanction Block &
2.5
NI Wkg.)
Total
3 ENGINEERING
3.1 Staff working
3.2 IBJ defect
3.3 GJ defect
3.4 Poor drainage
3.5 Point defect
3.6 Others
3.7 Engg. Construction
Total
4 DOT
4.1 Line faults
Total
5 ELECTRICAL
5.1 Supply failure
5.2 Others
Total
6 MECHANICAL
6.1 Damage by hanging part
6.2 Token lost
6.3 Others
Total
7 Miscreants
8 Miscellaneous
9 Bad weather
10 RE/Construction
Total (B)
Grand Total (A+B)
Chapter 3: Duties Of Signal Supervisors And Technical Staff Page 45 of 535