Page 561 - IRSEM_Main Book
P. 561

7.  "ATC  Route"  means  a  portion  of  track  where  a  Train  (including  Vehicle)  can  travel
                      according to the Cab Signal displayed by ATC. There are two types of ATC Routes.
                      a) Automatic  Route  –  It  is  applicable  for  Block  Route  where  ATC  Route  control
                        information is automatically controlled and the operator cannot intervene except for
                        temporary speed restriction.
                      b) Semi Automatic Route  – It is applicable for Station (including Rolling Stock Depot)
                        Routes  (Home  Route,  Departure  Route,  Fallback  Home  Route,  Fallback  Departure
                        Route,  Yard  Route)  where  the  ATC  Route  control  information  is  automatically
                        controlled based on Route setting by the operator.
                     c) "Automatic Train Control (hereinafter "ATC")"is as defined in "General Guidelines for
                        Management of Implementation Standards".

                  8.  "Automatic  Train  Supervision  (hereinafter  "ATS")"means  the  real  time  Train  control
                      supervision  system  which  regulates  performance  levels,  monitors  and  controls  the
                      Trains services and provides data to Controllers to adjust Train services to minimise the
                      inconveniences caused by Train operation disruptions.

                  9.  "Base Station" means the radio device to communicate with on-board radio device, as
                      well as with Train Radio network on the ground.
                 10.  "Block Route" is as defined in "General Guidelines for Management of Implementation
                      Standards".

                 11.  "Cab Signal" is as defined in "General Guidelines for Management of Implementation
                      Standards".
                 12.  "Cable Gas Pressure Monitoring System" means the system which supplies dry air into
                      the cable and monitors the gas pressure in order to detect breakage or cut of the cable.

                 13.  "Call Recording System (hereinafter "CRS")" means the system which is installed in OCC
                      having the function of recording designated incoming/outgoing calls to/from the OCC
                      such as through a Despatcher Telephone or Train Radio System.

                 14.  "CCTV System for Train Operation" means the system which is installed at the platform
                      and  is  used  to  facilitate  the  Station  staff  to  monitor  the  areas  at  platform  where
                      visibility is not good enough and where the Station staff requires to have assurance in
                      respect of opening/closing of Train doors.

                 15.  "Centralised  Information  Control  System  (hereinafter  "CIC"  or  "CIC  System")"  means
                      the  system  which  shall  collect  and  monitor  the  information  of  Signalling  &
                      Telecommunication facilities and disaster information necessary for train operation etc.
                      in  real  time,  and  also  perform  controlling  operation  for  some  of  Signalling  and
                      Telecommunication equipment.

                 16.  "Centralised Traffic Control (hereinafter "CTC")" is as defined in "General Guidelines for
                      Management of Implementation Standards".
                 17.  "Contact Detector" means a device mounted on the stock rail at the turnout to check
                      whether tongue rail and stock rail contacts closely for safe passage of Train.

                 18.  "Control Information Section" means a section where the control information for Cab
                      Signal is transmitted.
                 19.  "Controller" or "Despatcher" is as defined in "General Guidelines for Management of
                      Implementation Standards".

                                    Annexure G2: Brief of High Speed Signalling – Mumbai-Ahmedabad   Page 504 of 535
   556   557   558   559   560   561   562   563   564   565   566