(b) Engineering Gates, Traffic Gates:

                            (i)  Engineering  Gates:  Gates  beyond  the  outermost  stop  signals  are
                               called Engineering gates and are manned and operated by Engineering
                               staff. These gates may be non-interlocked or interlocked with signals.


                            (ii) Traffic  Gates:  Gates located  between  the  outermost  stop  signals are
                               called  Traffic  Gates  and  are  manned  and  operated  by  Traffic  staff.
                               These gates shall be interlocked with station signals.

               14.1.4  Normal Position of Gates: Normal position of Interlocked gates shall be as
                        per para 904 and 907 of IRPWM.

               14.1.5  Equipment at Level Crossing


                        (a) The Level Crossings shall be provided with equipment as per para 910 of
                            IRPWM. These equipments are provided and maintained by Engineering or
                            Traffic department.

                        (b) The Working instruction including the gate working diagram of level crossing
                            equipped with gate signals and situated outside the station limits, shall be
                            provided at the gate lodge. A copy of the working instruction shall also be
                            kept  at  the  controlling  station.  These  instructions  shall  be  provided  in
                            vernacular language.

                        (c) Safety measures for different classes of level crossings such as interlocking
                            with signals, provision of telephone communication and approach warning
                            arrangement shall be as per Annexure: 14-A1.

                        (d) Communication of approved type shall be provided between the Gate-lodge
                            and  the  Station  Master's  office/cabin  man  in  accordance  with  para  2  of
                            Annexure: 14-A1. Such communication may be provided to the authorized
                            operating  official  instead  of  Station  Master's  Office/cabin  man  to  suit  the
                            local operating condition. One to one communication shall be ensured. The
                            communication of Gateman shall also be with CTC (where provided).

                        (e) Audible warning by a bell/buzzer of approved type operated by the approach
                            of a train shall be provided at interlocked gates in accordance with para 3
                            of Annexure: 14-A1.


               14.1.6  Interlocking of LC Gates

                        (a) Norms as notified from time to time by Railway Board shall be followed for
                            Interlocking of Gates.

                        (b) Gate Signaling shall match sectional Signaling.